United States
(0 items: $0.00) 
ORDER SECURELY ONLINE OR CALL (847) 516-8882  | M-F 9AM-5PM / CST

Security & Help

Click here to verify



PayPal



Tech. Support
Live Technical Support
You are here: Home > Manufacturers > All Professional Industries
Load Shedding and Delay Devices


All Professional Industries, Manufacturer of the Load Shed A/C
Sort By:
Page of 1
2170 Generator LOAD SHED A/C SMART DELAY
2170 Generator LOAD SHED A/C SMART DELAY™ by All Professional Industries
Usually Ships in 1 to 2 Business Days
A.P's Price: $499.00

 Tax-Free   Free Freight
2155 LOAD SHED A/C
2155 Generator LOAD SHED A/C™ by All Professional Industries
Usually Ships in 24 Hours

 Tax-Free   Free Freight

Needs Install Kit # 2157 Residential or 2158 Commercial

2171 Generator Remote Start and or exerciser
2171 - Generator programmable exerciser with remote on/off switch - 12VDC
Usually Ships in 24 Hours
List Price: $249.00
A.P's Price: $195.00
You Save: $54.00!

FREE SHIPPING
2175 Generator LOAD SHED for Heater Strips
2175 Generator LOAD SHED for Heater Strips by All Professional Industries
Usually Ships in 24 Hours
List Price: $249.00
A.P's Price: $195.00
You Save: $54.00!

 Tax-Free   Free Freight

Needs Install Kit # 2157 Residential or 2158 Commercial

2161 Generator LOAD SHED A/C PLUS 30A
2161 Generator LOAD SHED A/C PLUS 30A™ by All Professional Industries
Usually Ships in 1 to 2 Business Days
List Price: $339.00
A.P's Price: $289.00
You Save: $50.00!

 Tax-Free   Free Freight

Needs Install Kit # 2157 Residential or 2158 Commercial

2162 Generator LOAD SHED A/C PLUS 60A
2162 Generator LOAD SHED A/C PLUS 60A™ by All Professional Industries
Usually Ships in 1 to 2 Business Days
List Price: $439.00
A.P's Price: $389.00
You Save: $50.00!

 Tax-Free   Free Freight

Needs Install Kit # 2157 Residential or 2158 Commercial

2163 Generator LOAD SHED A/C PLUS 100A
2163 Generator LOAD SHED A/C PLUS 100A™ by All Professional Industries
Usually Ships in 1 to 2 Business Days
List Price: $519.00
A.P's Price: $469.00
You Save: $50.00!

 Tax-Free   Free Freight

Needs Install Kit # 2157 Residential or 2158 Commercial

LOAD SHED A/C™ INSTALLATION KIT 2157
2157 LOAD SHED A/C™ RESIDENTIAL TRANSFER SWITCH INSTALLATION KIT
Usually Ships in 24 Hours
A.P's Price: $49.00

FREE SHIPPING
LOAD SHED A/C™ COMMERCIAL INSTALLATION KIT 2158
2158 LOAD SHED A/C™ COMMERCIAL TRANSFER SWITCH INSTALLATION KIT
Usually Ships in 24 Hours
A.P's Price: $59.00

FREE SHIPPING
2190 200A - 100A - 100A Generator Termination split box
2190 1-Genset feeding 2-100A Transfer Switches - Generator Termination split box UL
Usually Ships in 24 Hours
A.P's Price: $329.95

FREE SHIPPING W / Generator Purchase
2191 400A - 200A - 200A Generator Termination split box
2191 1-Genset feeding 2-200A Transfer Switches - Generator Termination split box UL
Usually Ships in 3 to 5 Business Days
A.P's Price: $499.95

FREE SHIPPING W / Generator Purchase
2180 3R Aluminum Enclosure
2180 3R Aluminum Enclosure for Kohler RRT-JFNA-0100B & Generac 8, 10, 12, 14 and 16 circuit Transfer Switches
In-Stock - Ships within 24 Hours
List Price: $674.50
A.P's Price: $479.00
You Save: $195.50!

Tax-Free  Free Freight w/generator purchase
   
 
The Load Shed A/C™ allows two or more large air conditioners to operate on a generator sized for only one air conditioner. When the utility fails and the transfer switch flips down to generator power, the Load Shed A/C will shut off one air conditioner while allowing the other to operate until the adjustable timer expires. The Load Shed A/C will then allow the second air conditioner to operate on the adjustable timer. When the second timer expires, the process will start over again with the first air conditioner.

The LOAD SHED A/C PLUS™ has all the same adjustable components as the Load Shed A/C, plus will turn off circuits as large as 200 Amps automatically while on an automatic generator system.

The Load Shed A/C Smart Delay™ staggers when air conditioning turns on. Whether there are 2 or 8 air conditioners, the Load Shed A/C Smart Delay will stagger each air conditioner five seconds apart, thus lowering the surge of the generator's surge capablities.